Bill, David, and I arrived in Tonopah last night.
This morning, we got the site tour from Steve, set up some shade canopies, started unpacking the lidar container, and built the stage platform that the windcube lidar will go on.
This afternoon, we started putting rass dishes together, unloaded more from the lidar container, did a better job securing the canopy in the enclosure where the profiler will go, and set up a very involved shade tarp between the two containers. Hopefully it'll still be attached in the morning.
Josh and Tony arrived in MISS around 4:30. MISS is roughly in place, but will need to be moved a few feet tomorrow, and leveled. We can move ISS1 into position tomorrow now that we have the green truck. The power panel at the site isn't ready yet, but will hopefully be done on Monday.
Feel free to add whatever I've forgotten.