Staff: Chris, Rick; Chenning on site most of the day
10:00PDT sounding: here's Chris demonstrating old-school launch technique
Chris and Chenning took me out for my first visit to the array. Chris walked through what the various equipment was, the various things that may arise, what to do about them etc.
Inspected all plots, did a physical walk-by of the equipment, everything looks good.
Re-familiarize myself with Nagios reporting. Noticed a "critical" report on ISS1 that the "USB Backup" task had been failing. Contacted Gary for pointers on how to troubleshoot that (Chris says Gary may already be aware of and working on it).
11:45PDT: 449 2.9A
915 2.45A
15:00PDT sounding: Rick utilizes old-school launch technique; definitely more rewarding.
19:00PDT-ish: the array at sunset