Time | 0.5m | 1m | 2m | 4m |
---|---|---|---|---|
bridges | CT21 | CT22* (using CT23, cabled as CT22) | CT31 | C32 |
30 Jul 14:00 | SF1 | SF2 | SF3 | X |
1 Aug 14:30 | SF1 | SF2 | SF3 | SF5 |
24 Aug 17:00 | SF7 | |||
29 Aug 17:00 | SF9 | |||
31 Aug 12:30 | removed | removed | removed | removed |
Events:
- 30 Jul: CT22 was outputting 7V, caused by a shorted probe support. CT22 was very hot, so I didn't quite trust it going forward. Thus, I put CT23 in CT22's position and used CT22 cabling.
- 1 Aug: 2m was shorted (replaced probe support); 4m was open (SF4 is now bad). Also cable 32IN was bad: replaced by 33IN (but CTA32 and cable 32OUT are still being used for 4m.
- 2 Aug: hotfilms still running. To monitor, I use:
data_dump -i -1,501 -i -1,510-513 sock:localhost:31000 (now aliased to "hfd" on ustar)
- 3 Aug, about 10:00 – all hotfilm probes rotated to horizontal.