Another sunny day. The high temperature was around 80 like yesterday, however with almost no wind until a very light midafternoon breeze finally appeared, it felt hotter.
We have almost finished the ISS teardown. Antonio, Josh, Sam, and I worked on the ISS teardown, and David helped out the ISFS crew. We packed the last of the equipment, disconnected power to ISS1 and MISS, pulled and loaded the power cables and stairs, and finished loading the containers. There will be just a little tidying up around the site tomorrow.
This evening we had dinner with Shane at the Mizpah for his last day in Tonopah. Thanks Shane, it's been great working with you on this campaign.
Preparing the ISS1 trailer (left) and packing the storage container (right).