So sorry. This is a redundant log entry. First entry was in the main Manitou Log entry page.
Attendees: Chris, Kurt and Ned.
Arrived at 11:25am
Departed at 1:15pm
Removed LiCors and TRHs at all heights. The LiCors were at the following heights.
2m: s/n 1163
7m: s/n 1166
15m: s/n 1167
45m: s/n 1164
We unplugged main power to all LiCors in the battery boxes. Replaced both outside GFI outlets. Both outlets were blown. Power back to both outlets. Beacon back on.