• No labels

3 Comments

  1. 28Sep2019

    RF19

    Flight Tech: Ed K


    Preflight

    Did not blow-out nose P-lines postflight yesterday due to imminent rain, no time preflight today

    Still using spare server, removed original server from R-6 postflight yesterday

    Chris W worked on original server at ops, back in R-6 today as back-up

    DPL is blue, DPR in re-balance, DP_DPL nan in aeros => still not plotting, CavP_DPL=-47hPa

    RWO 10um EDVs low, cycle probe power 3x, DSM 1x, no change


    1211 Taxi to runway, fog rolled in, runway closed, return to FBO (need 4km visibility here)

    1227 RWO,LWO,CDP,DPRs,RSTB,Rads,VXL => 9 sensors off

    1312 9 sensors on


    1340 Taxi

    1345 Takeoff

    1356 DPR is back

    1357 RWO 10um EDVs low on ascent, I do nothing

    1404 Reboot VXL

    1410 QCR froze-up

    1418 RWO 10um EDVs back, I did nothing

    1420 At 41Kft, CavP_DPL=-47hPa,CavP_DPR=386hPa,DP_VXL=-64C,R-6 DPreadout DPL=-66C,DPR=-63C

    1910 Land


    Blew-out all P-lines in nose postflight


  2. Unknown User (abailey)

    Looks like most of the nose pressure readings were okay, just not QCR. Thanks for all your work staying on top of this!

  3. CAVP_DPL is still railed.  I suspect cabling/connectors if sensor is good (and a simple volt meter reading was good).

    IRIG on nose DSM starting losing sync on and off towards the end of the flight.