Staff: Jacquie, Josh
Weather: Sunny, light winds from the south, high 70's.
Notes:
- We replaced the bad CSAT's at t1 and t22 with the remaining spares.
- We replaced the TRH casing at t41 (the ladder is now parked there)
- The radiometers have been cleaned.
t1 | CSAT3A SN 1312 | EC100 SN 1800 | PPE000020722 |
---|
t22 | CSAT3 SN 0539 | PPE000016613 |
---|
t41
- Replaced the TRH casing. The SHT sensor is the original.
...
All the bad sensors have been labeled.
One more thing: we noticed that the glass on the bad t1 CSAT3 was broken.