Josh and I onsite. Another clear, warm day with light winds. Not enough aerosols for the lidars!
All trucking along well data-wise, but don't worry, Steve is busy thinking of things for us to do. Looked into the low tc at t29 (see blog post) but so far no resolution. Saw Gary's post about the 0.5m hot film, but by the time I was getting ready to go out and switch the probe, it's back to working again. Steve says the short might also be in the cable between bridge and probe (we could try a spare) or in the probe holder (we don't have spares). I've been mostly playing with the PurpleAir we removed from the array yesterday and working on a presentation for the M2HATS open house on Wednesday.