Timing:
- Steve already there; Clayton arrives 2/23 (last day of ops)
- strip all towers of instruments, pack in base
- remove heating stuff from CSATs
- good luck removing soils!
- provide some assistance to remove PI sensors
- sort out NCAR vs. UU radiometers/ventillators
- return HRXLs
- return CS125s (DC is ISS's, I think)
- return to remove satellite infrastructure
- strip all towers of instruments, pack in base
- Dan, Tony, Chris arrive 2/28ish
- coil up supersite power cables, pack in Penske for Boulder
- help remove cc solar panels (hope we can drive in)
- remove fencing
- pull TTs out to a staging area
Need to arrange:
- Trailer Transit for base to SWEX
- Trailer Transit for TTs back to Boulder
- Penske from Boulder to bring SWEX infrastructure
- PAM tripods; booms; clamps
- more job boxes/batteries?
- more solar panels?
- Penske in Heber to return to Boulder
- power cables/transformers
- Rohn towers
- thermocouple motes
- anything dead (solar panels with bad connectors, etc.)
- v2.7 stuff, Kipp&Zonens, ventillators
Issues:
- Do we leave ventillation on NR01s? (I'd like to, but don't know wiring)