Timing:

  • Steve already there; Clayton arrives 2/23 (last day of ops)
    • strip all towers of instruments, pack in base
      • remove heating stuff from CSATs
      • good luck removing soils!
    • provide some assistance to remove PI sensors
      • sort out NCAR vs. UU radiometers/ventillators
      • return HRXLs
      • return CS125s (DC is ISS's, I think)
    • return to remove satellite infrastructure
  • Dan, Tony, Chris arrive 2/28ish
    • coil up supersite power cables, pack in Penske for Boulder
    • help remove cc solar panels (hope we can drive in)
    • remove fencing
    • pull TTs out to a staging area

Need to arrange:

  • Trailer Transit for base to SWEX
  • Trailer Transit for TTs back to Boulder
  • Penske from Boulder to bring SWEX infrastructure
    • PAM tripods; booms; clamps
    • more job boxes/batteries?
    • more solar panels?
  • Penske in Heber to return to Boulder
    • power cables/transformers
    • Rohn towers
    • thermocouple motes
    • anything dead (solar panels with bad connectors, etc.)
    • v2.7 stuff, Kipp&Zonens, ventillators

Issues:

  • Do we leave ventillation on NR01s? (I'd like to, but don't know wiring)


  • No labels