8/30/16

Summary:

  • light winds from the E to NE

Actions past 24 hours:

  • installation of tall tower, network connection to tower is acting up
  • no solar charger/power monitor at tall tower, replacement on its way from Boulder

To dos:

  • replace battery at tall tower
  • work on data displays
  • shoot tall tower booms

Sensor status:

T/RH:  ok
P: need to confirm locations, s1 is ok. Not sure about sensors at  s3 and s15 need to check config
2D Gill: ok
csat u,v:  ok
csat ldiag: spiking up to 1 on all: 
csat w, tc: ok
EC150: ok
motes: data not coming in
Wetness: unknown
radiation: unknown
Tsoil: unknown
Gsoil: unknown
Qsoil: unknown
Cvsoil: unknown
Battery: Gary says he needs to do some configuration work