Clayton, Sebastian, and I almost completely removed instrumentation from PRS. The only sensors standing are the NR01, CS125, and a ceilometer, mostly because we didn't have shipping boxes. Almost all cables (except the main power) have been removed. The TT is down and nearly ready to be pulled out tomorrow.
Was able to remove all soil sensors, in part because the ground never really healed after the install, so I was able to break open several of my "clods".
A really good day!