Back to sunny and hot, with a few scattered Cu. I arrived to mess up everyone's workflow....
Spent a 10-hour day addressing (almost) everything on the tower line:
- All sonics now mounted and connected to their appropriate DSMs
- All sonics that should have them now have Quad Disk Probes connected
- TRHs are all up. We found that TRH.2m.t0 wasn't coming in due to a DSM port issue. We moved it from DSM4.t0b to DSM7.t0t.
- Isabel had issues with T8's serial board, so she replaced the entire DSM with a spare. Seems much better.
- All soil sensors and radiometers installed. Still need to dress the cables and flag the sample area for soils at T23.
So, a productive day. Finishing up the tt and getting it erected is on the docket for tomorrow. I'll probably peel off to work on burn-in issues.
The view down the entire line of sonics at 4m, with REAL in the center of the image, 1.4km away.