Staff:

Steve, Matt, and Mack.

Weather:

Mostly cloudy to overcast all day and 5-10 degrees cooler than it's been, with just a few sprinkles around. Winds were moderate and pretty consistent out of the south all day. 

Soundings:

Students launched at 10am and 3pm local.  No known problems.

Checklist:

  •  water level in lidar is good
  •  web plots
  •  real-time lidar displays
  •  449 power: 2.94 A in the afternoon

Cleaning:

We did not clean the lidar lenses or NR01 due to the chance of light rain, but will do so tomorrow, weather permitting.

Other notes:

Isabel fixed an issue with data being copied from the field, but web plots are not working at the moment. The MISS DM monitor is still not working (immediately going into power save mode). The tape covering the lidar water jog had blown off, so I replaced it. There seem to be some bugs floating in it, so I’ll replace the water tomorrow when we clean the lenses.

  • No labels