- Used the Leica to scan the entire field and our array in real coordinates. The only things that I know I missed were the last 2 lidars (not yet set up) and the Tsnows (not yet set up). I think I miss-labeled the lidars 5&6 as 3&4.
- Chris grabbed a bunch more of the EC100/EC150/nano serial numbers (visually)
- Chris worked with Ethan to set up 4 of the 6 lidars. In the process, he cleaned up the cabling of the towers (and found one missing safety pin).
- Took a bit of slack out of some of the power/ethernet cables on the ground
- I 'm not sure if Chris connected tubing to the snow nanobarometers on c or not.I also spent a bit more time on qctables and the config, so that qctables now shows a complete dataset (except for the Tsnows that aren't deployed)
- Moved a couple more things into storage
...