Weather: even warmer, same breezes came up during the day
People: everyone left the site by 4. We're done with set-up!
Tasks:
- Helped Ethan get his Pis connected and powered
- Swapped the ec150.3m.c since it was reading high
- Documented tensions (ue had loosened some, but all still okay – see table elsewhere in this blog)
- Took soil core at 1130 (see comment below)
- Capped off unused pressure ports
- Packed up and removed the on-site staging pile
- We're hoping for the best!
1 Comment
Steve Oncley AUTHOR
Can't figure out how to use the Google form for gravimetric data (our link is to the template):
Today (10/14/2022) I took a core near the soil sensors at d.
Time: 11:30
Tin: 2
Tare: 21.0g
Wet: 126.8g
Qsoil during this time read: 0.142 m^3/m^3 (14.2%V)
Will dry this and weigh again when we return to Boulder early next week.
My intent is to take just one more core during tear-down, and not fight the weight of the corer and frozen ground.