Jacquie will have us create a data monitoring page, but for set-up/burn-in, I'm going to keep track of issues here:

d:

  • Today, swapped ports 5&6 to get the soil/snow motes right
  • Today, also moved TS036 (10cm) from the "snow" to the "soil" mote
  • Found that the Tsoil that I read as TS17 is reporting as TS47.  Have just updated the config on "d" and Gary propagated into git.
  • But, as of yesterday morning, all Tsoils stopped getting to qctables, even though sensors are running on DSM. (Other soils are fine.) (

    data_dump -i 10,1289 -p works, but prep -D Tsoil.9.4cm.d -f sock:localhost doesn't). A restart of statsproc today seemed to get these going.

  • Apogee now mounted and reporting
  • no Tsnows yet

ue:

  • had to pio cycle 3 to get the nano to report
  • Gary saw error flags on the 3m EC100.  All looked okay yesterday, though the co2 levels are quite low – maybe nidas limit checking was setting flags.  However, now I see no evidence of it at all in qctables.  Found that it was reading all FF, but came back to good values with a power cycle.  Still running a day later.
  • Apogee now mounted and reporting
  • no Tsnows will be installed here.

uw:

  • NR01 and wetness mounted and reporting
  • Apogee now mounted and reporting
  • no Tsnows yet

c:

  • cu, ct are mounted, power and network cables connected, but not running.  Rerouting DC power fixed this.  Now all DSMs are up and reporting.
  • cb, cl, cm mounted and running
  • TRHs from 1–10m mounted and running
  • snow nanos connected (but no inlets set up).  Need to attach tubing, then leave for Jessica in January.
  • flowcapts mounted, but not yet connected (need code to handle 2 such USB devices in one DSM).  Gary got these running.
  • 4 pillows are now in place, 3 responding and reporting.  The 4th (#1) electronics box doesn't read the load.  Jessica is investigating.
  • Apogee now mounted and reporting
  • need to figure out if sonic or EC150 should be mounted at 1.5m.  Deferred until later.

Other:

  • where to add webcam?  d.5m. Done and reporting
  • add NR01 & wetness to qctables (NR01 done, add wetness) DONE
  • add second Victron to cl (done mostly, but need to change names in qctables) DONE

Some tasks:

  • take gravimetric sample
  • take Leica readings
  • read more serial numbers
  • read guy tensions before leaving
  • Still some cable clean up
  • No labels