Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Task marked complete

9/9/16

Summary: Light winds, < 5 m/s, out of the SW, partly cloudy.
                 Morning trip to the Marsh to work on S8, S15, and S4 (rain gauge).

Actions past 24 hours:

  • Morning Marsh visit to 4, 8, and 15

To dos:

  •   installation of rain gauge at S4
  •   installation of NR01 and mote #1 at S15 and install new TP01 PIC
  •   repair of power/monitor system at S8

Sensor status:

T/RH:  ok
P: ok
2D Gill: ok, down at S8
csat u,v:  ok
csat ldiag: ok
csat w, tc: ok
EC150: ok
motes: ok, no soil at #1 and #3
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok, monitor since it is now coming in
Qsoil: ok
Cvsoil: not responding
Vbatt: ok, battery at site 15 getting low at night, will monitor