Weather: another beautiful day. A bit chilly at times

People: Steve, Chris, Tony, William, Antonio, Gary, various other people, including a couple of cemetery Parks people.

A lot of progress!

Started the morning leveling/tensioning c, d, and ue

Prepped a LOT of sonic booms

Installed sonics on c at 20, 15, and 10m.  Placed brackets for the other sonics on c.

Installed sonics and K&Z radiometers on d.  d is now completely instrumented, except for user sensors.

Gary has port forwarding working on the cradlepoint, so we should have access to the DSMs currently running (d, cb, ue, uw, not sure about cl yet)


  • No labels

7 Comments

  1. Steve Oncley AUTHOR

    I forgot to mention that Chris spotted a vole (I think) peeking out from one of the hundreds of holes in the ground.  He even got a photo.  Cables on the ground, watch out!

  2. Steve Oncley AUTHOR

    In looking at data from d, I've found 2 problems with quick solutions:

    • The motes connected to ports 5 and 6 need to be swapped
    • The Tsoil connected to the upper mote, port 2 (the middle Binder connector) needs to be moved to the lower mote.

    I also note that d's data collection had stopped.  There was no process to "ddn".  I did a "dup" about 30min ago.

  3. Center 70' tower tensions:


    1. Steve Oncley AUTHOR

      Added to Site/Tower Information table

  4. 35' tower tensions:


    1. Steve Oncley AUTHOR

      Added to Site/Tower Information table