Power cable and data cables between the walk-up and turbulence towers were trenched into position on Monday, October 5 2009. Connections at either end of the cables will be completed shortly.
Power cable and data cables between the walk-up and turbulence towers were trenched into position on Monday, October 5 2009. Connections at either end of the cables will be completed shortly.