Paul Painter from Green Mountain Falls Electric completed the installation of the electrical enclosure at the turbulence tower, and the connecting of the power cables at either end on October 7. So, line power should now be available at the turbulence tower.
The service should be 5 kVa, there should be two circuits each with outlets inside the enclosure and water proof outlets outside the enclosure.