Just to put this in one place: (number of minutes)

  • DONE Flip uw.1m sonic (the head to the cassette) (5) 
  • 3/4 DONE Upgrade software on snow pillows (waiting for software and cable to be sent from Hydromet20)
  • DONE Install CSAT3BH (waiting for sensor to arrive in Boulder, then be tested and cabled in Boulder)15)
  •  DONE Seal Possible changes to seal all CSAT cassette mounts (need to decide if needed and what to do)120) 
  • DONE Clean radiometers (2m NR01 and 9m K&Zs) (10)
  • DONE Another soil sample ?(10)
  • DONE Install wifi extender, attached to cm dcdc power (and swap in 20W dcdc converter) (15)
  • DONE In in cb and cl, move the ethernet switch power from bank1 to the dcdc terminal on the power panel (bring extra dcdc converters?) (5)
  • DONE Check new pillow prompting code that Gary may install (unknown)
  • DONE Read guy tensions (20)
  • Remove cassettes from spare CSAT3As, if time allows (15)

Total: (235 min = 4h, but could do some tasks in parallel)

What to bring:

  • individual allen wrench set with 5/32" (on shelf)
  • snow pillow cable and windows laptop (on shelf)
  • CSAT3BH and mount and mounting bolts (on shelf)
  • Seal and Peel and caulk gun (grab another gun from home)
  • Kim wipes and alcohol (on shelf)
  • soil kit (on shelf)
  • wifi extender and cables and dcdc converter (from Gary)
  • more dcdc converters (have 1 extra 20W for d to power Xtream's Ubiquiti and 2 extra 10W just in case cb and cl don't have them)
  • my tool bag (in car)
  • tire chains (in truck)