You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Hoping that this visit can occur while the road is still open...

Just to put this in one place:

  • Flip uw.1m sonic (the head to the cassette)
  • Upgrade software on snow pillows (waiting for software and cable to be sent from Hydromet)
  • Install CSAT3BH (waiting for sensor to arrive in Boulder, then be tested and cabled in Boulder)
  • Possible changes to seal all CSAT cassette mounts (need to decide if needed and what to do)
  • Clean radiometers (2m NR01 and 9m K&Zs)
  • Another soil sample?
  • Install wifi extender
  • in cb and cl, move the ethernet switch power from bank1 to the dcdc terminal on the power panel


  • No labels