Gordon, Sep 30
Laura, Chris, Kurt and I instrumented the rim tower
The 0 end of the measuring tape was at the top of the tower, with the 40 meter indicator at the base plate. The first column contains the values read from the tape, the second column is then (40-x) or the height above the ground:
measurement (meters) |
height (meters) |
---|---|
34.99 |
5.01 |
29.78 |
10.22 |
25.11 |
14.89 |
20.32 |
19.68 |
15.02 |
24.98 |
10.44 |
29.56 |
5.02 |
34.98 |
-0.29 |
40.29 |