10/28/13
Summary:

  • This was supposed to be our down day, so John and I visited Walnut Canyon on our way in
  • Preparing for tear-down
  • The forecast winds came -- average >20m/s at rim.40m all day; gusts 10m.base also 20m/s
  • Open house tonight (despite the blowing)

Actions past 24 hours:

  • Continued Qsoil.base plot testing
  • flr died just as we came in.  We hesistated due to wind, but went into the crater anyway.  DSM power cycle fixed.  Lost data for ~4 hours.

To dos:

  • Start packing up

Sensor status:

T/RH: ok.
P: ok.  NNE clearly higher during these winds
csat u,v: sustained winds over 20m/s at near; 25m/s at rim; 15m/s at base
csat ldiag: ldiag firing at a low level on many of the sonics
csat w, tc: ok
kh2o: typical
motes: ok
Wetness: ok
radiation: typical
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: ok.
2D sonic: ok

  • No labels