10/28/13
Summary:
- This was supposed to be our down day, so John and I visited Walnut Canyon on our way in
- Preparing for tear-down
- The forecast winds came -- average >20m/s at rim.40m all day; gusts 10m.base also 20m/s
- Open house tonight (despite the blowing)
Actions past 24 hours:
- Continued Qsoil.base plot testing
- flr died just as we came in. We hesistated due to wind, but went into the crater anyway. DSM power cycle fixed. Lost data for ~4 hours.
To dos:
- Start packing up
Sensor status:
T/RH: ok.
P: ok. NNE clearly higher during these winds
csat u,v: sustained winds over 20m/s at near; 25m/s at rim; 15m/s at base
csat ldiag: ldiag firing at a low level on many of the sonics
csat w, tc: ok
kh2o: typical
motes: ok
Wetness: ok
radiation: typical
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: ok.
2D sonic: ok