10/6/13, twh
Gordon and Tom serviced the RIM tower
Arrived 12:35 pm, left site at 2:00 pm
Taped Gordon hole.
Replaced Verizon modem ethernet cable.
Replaced 20m TRH SN 11 with SN 28 because 20m T was anomolously high. However the new TRH only lowered the anomaly a bit.
Calibrated DataScope; 5m CSAT: 61.9, 61.7, 62.0, 62.1, 61.7, 61.9, 61.7, 62.1 (mean=61.9 magnetic).