Weather: even warmer, same breezes came up during the day
People: everyone left the site by 4. We're done with set-up!
Tasks:
- Helped Ethan get his Pis connected and powered
- Swapped the ec150.3m.c since it was reading high
- Documented tensions
- Took soil core at 1130
- Capped off unused pressure ports
- Packed up and removed the on-site staging pile
- We're hoping for the best!