You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

Weather: even warmer, same breezes came up during the day

People: everyone left the site by 4.  We're done with set-up!

Tasks:

  • Helped Ethan get his Pis connected and powered
  • Swapped the ec150.3m.c since it was reading high
  • Documented tensions
  • Took soil core at 1130
  • Capped off unused pressure ports
  • Packed up and removed the on-site staging pile
  • We're hoping for the best!



  • No labels