Hoping that this visit can occur while the road is still open...
Just to put this in one place:
- Flip uw.1m sonic (the head to the cassette)
- Upgrade software on snow pillows (waiting for software and cable to be sent from Hydromet)
- Install CSAT3BH (waiting for sensor to arrive in Boulder, then be tested and cabled in Boulder)
- Possible changes to seal all CSAT cassette mounts (need to decide if needed and what to do)
- Clean radiometers (2m NR01 and 9m K&Zs)
- Another soil sample?