You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Hoping that this visit can occur while the road is still open...

Just to put this in one place:

  • Flip uw.1m sonic (the head to the cassette)
  • Upgrade software on snow pillows
  • Install CSAT3BH 
  • Seal all CSAT cassette mounts 
  • Clean radiometers (2m NR01 and 9m K&Zs)
  • Another soil sample
  • Install wifi extender, attached to cm dcdc power (and swap in 20W dcdc converter)
  • In cb and cl, move the ethernet switch power from bank1 to the dcdc terminal on the power panel (bring extra dcdc converters?)
  • Check new pillow prompting code that Gary may install
  • Read guy tensions


  • No labels