Hoping that this visit can occur while the road is still open...
Just to put this in one place:
- Flip uw.1m sonic (the head to the cassette)
- Upgrade software on snow pillows
- Install CSAT3BH
- Seal all CSAT cassette mounts
- Clean radiometers (2m NR01 and 9m K&Zs)
- Another soil sample
- Install wifi extender, attached to cm dcdc power (and swap in 20W dcdc converter)
- In cb and cl, move the ethernet switch power from bank1 to the dcdc terminal on the power panel (bring extra dcdc converters?)
- Check new pillow prompting code that Gary may install
- Read guy tensions